January 2023 – March 2023 – selection of the diameters of the steam pipelines after the turbine
December 2022 – currently – documentation for the modernization of the OR32 boiler
October 2022 – currently – acting as the Investor’s Supervision Inspector in the construction of three gas boiler houses
February 2022 – September 2022 – modernization of feed water pipelines from pumps to steam boilers and steam pipelines from boilers to steam turbine along with a fresh steam collector
October 2021 – November 2021 – Documentation of boiler OOG420 marked as K5 located in PKN Orlen Refinery in Płock city, in scope of measurement stub-pipes and blind bottom of boiler pressure part
January 2021 – December 2021 – Report work out from Project execution of the pulverized boiler modernization with capacity 140 Mg/h fired by hard coal
November 2020 – currently – Peak-stand-by boiler house erection, fired by natural gas with capacity 150 Mg/h – Project Manager acting on General Designer’s behalf
November 2020 – January 2023 – Reconstruction of the existing power plant involving installation of the second new natural gas fired boiler in existing technical building no.58 with the restoration of the necessary infrastructure with simultaneous limitation of existing coal fuel combustion sources – Project Manager acting on General Designer’s behalf
August 2020 – September 2020 – construction of desulphurization plant for pulverized boiler with capacity 140 Mg/h – supervising services
July 2020 – August 2020 – technical-economical analysis of the possibility coal fired boilers replacement to boilers fired by alternative fuels
February 2020 – June 2020 – technical and economical supervision services of projects in execution
August 2019 – December 2019 – advisory services during running the business
February 2019 – January 2020 – assembly and providing the leak proof test and investigation of soot blowing stoker fired WR25 and WR12 boilers installation with operation documentation elaboration
January 2019 – carrying out the leak proof test of soot blowing stoker fired OR32 K1 and K2 boilers installation
June 2018 – October 2018 – carrying out the leak proof test and investigation of two soot blowing stoker fired OR40 boilers installation with operation documentation elaboration
March 2018 – strategic plan and analysis elaboration for roadwork company
October 2017 – November 2017 – carrying out the leak proof test and investigation of soot blowing stoker fired OR50 boiler installation with operation documentation elaboration
July 2017 – December 2017 – Advisory and supervision services of boiler’s installation equipment repair works